Jump to content
Sign in to follow this  

change order of slides in Quickslide?

Recommended Posts


I find myself needing to rotate the four slides with their captions, but haven't found any other way than cutting and pasting the content back and forth. Is there an easier way?



Share this post

Link to post
Share on other sites

Quickslider is intended to get your slider on your site setup and running as soon as possible with very few settings. 


For a much more advanced slider with many more options including ability to arrange the slides try the Feature Slider http://support.pagelines.me/docs/sections/features/

The answer to many issues can be found by searching in the forum before posting as someone else  may very well have had the same problem before you have.  Also, reading the documentation can help you gain a good understanding of how everything works. 


Please do not send me private messages. Occam's razor - The principle states "Keep things simple!"

Share this post

Link to post
Share on other sites
James B

With the feature slider you can change the order using - http://wordpress.org/plugins/post-types-order/

Kindly search the forum and read the documentation before posting. It will help you resolve many issues.

For CSS help be sure to check out W3Schools first and be sure to download FireBug for FireFox for troubleshooting.

James B

Share this post

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

Sign in to follow this  

  • Similar Content

    • triggerfish
      By triggerfish+
      I am stumped here, The Mega menu drop down menus are going under the Quickslider.
      I have tried the Z-index with no luck..any ideas here would be greatly appreciated.
    • richardjacruz
      By richardjacruz+
      I received our monthly Alexa report, and it pointed out that there were missing alt tags on EVERY page on our site. Upon closer inspection, it looks like the QuickSlider which is used for the scrolling banners at the top of the site doesn't bring in the alt tags. Recently, you made a change to the RevSlider to allow images to have "alt" tags. Can you do that for the QuickSlider too?
    • selmakdesign
      By selmakdesign
      Could really use some help on this one:
      How can I customize the navigation in the quickslider?
      The navigation (previous and next slide) is a font awesome icon which looks like a simple grey box.
      1. I'd like to replace this with custom arrow images?
      2. Is it possible to also add to the navigation: first slide/last slide?

    • pehja
      By pehja+
      I am getting pretty tired of things that does not work as it should in DMS. Now it is impossible to have a two column footer with quickslider as one of the items. Take a look here http://pehjaproduction.se/kulingen/
      I have tried three column, two column, no column. nothing works. 
    • saur0
      By saur0
      Hi, i'm in the process of building a site for a client, but the the dropdown part of the navbar is going behind the quickslider section. Ive tried removing and re-adding the sections but it doesn't changes anything. I've  never had this problem before when using these sections. 
      The Navbar is in the headder and the quickslider is on the main page. The site is http://tvfrom.net